Industrial oil-water cooling system renewal

  The system is in a cca 120 x 70 m large cellar installed. In this system must be replaced old - hand oparated liquid control -
to an new automatised electrononically controlled system. The old carbonsteel tubes ware replaced with anticorrosion elements,
and new functions also were installed.
Without the 3d model of the cellar the work would be inpossibile. We need to check where the remaining system is
and how correct the model of the cellar is.

an other view from the typically  ND80 tube system
    enlarge



below shown the dense installed part of the cooling system - which on the right side is on above pics

The oil in the 20...40 m³ tanks must be tempered by oil/vater heat exchanger and pump systems



From the model was created fabrication documentation also